The Mumbai Metro Line 3, also known as the Aqua Line, is rapidly transforming the city’s commuting landscape, with two phases already operational and the final stretch nearing completion. This fully underground corridor is proving to be a game-changer for officegoers and residents alike, significantly alleviating traffic congestion, slashing travel times, and seamlessly integrating with existing and future transit lines. The project stands as a testament to Mumbai’s commitment to ... The Aqua Line Metro route will span across Cuffe Parade to Aarey Depot, with a total of 27 stops, 26 of which will be underground stations. Phase one of the line will commence operations on October 04, linking the city’s western suburbs. The second phase, connecting central Mumbai to the Island City, is expected to follow shortly. Prime Minister Narendra Modi will inaugurate the final section of Mumbai Metro 3, also called the Aqua Line, on September 30. This stretch connects Acharya Atre Chowk in Worli to Cuffe Parade, completing the 33.5 km route from Aarey JVLR. Once fully operational, Metro 3 will feature 27 stations - 26 ... The Line 3 (Aqua Line) is a operational line of the Mumbai Metro, running from Aarey JVLR to Cuffe Parade. It covers a distance of 33.5 km through the heart of Mumbai. The line was inaugurated on 7 October 2024 (Partial), 9 October 2025 (Complete) and serves 27 stations along its route.

Available

Product reviews

Rating 4.5 out of 5. 8,008 reviews.

Characteristics assessment

Cost-benefit

Rating 4.5 out of 10 5

Comfortable

Rating 4.3 out of 5

It's light

Rating 4.3 out of 5

Quality of materials

Rating 4.1 of 5

Easy to assemble

Assessment 4 of 5